Wednesday, January 17, 2007

Stitching


So Saturday was a busy day. About 4 or 5 hours of work. Here is the summary. First we drilled holes along both sides of the bottom panels and wired the straight keel edge. Next we stitched the ends of the sides together.


Then we opened up the side panels...




and then placed the bottom panels onto of the sides and opened them like a book along the stitched keel.





Luke then drilled holes along the edge of the side panels that aligned with the holes on the bottom panels.




No comments: