Showing posts with label kayaks. Show all posts
Showing posts with label kayaks. Show all posts

Wednesday, January 17, 2007

Fitting the bulkheads

As part of the fairing process, you must locate the bulkheads and check their fit. The primary purpose of the bulkheads is to give the kayak reserve stability - so that if the cockpit is filled with water, the kayak doesn't sink. They also give the hull some support and help get the shape correct. The forward bulkhead is in front of the cockpit, while the aft bulkhead is just behind the paddler.

On our first kayak (the Chesapeake 16 LT) - the aft bulkhead fit very well the first try. The forward bulkhead was a different story. The next two pictures show the problem.



You may notice that the bulkhead is tight at the top corners (the sheer), but has a big gamp at the bottom corner (the chine). The big gap at the chine would be difficult to fill (and make watertight), and the beam across the deck was a bit wider than the plans indicated it should be.
After a trip to Chesapeake Light Craft for consultation with the designer, we decided to move the bulkhead forward a bit (about 3 inches). This required trimming the upper corners of the bulkheads. The final product came out pretty well. The gap around the bulkhead was rather small, and fitting the bulkhead into the hull didn't require a lot of hull deflection.



True the Hull

So now that the hull is in one piece the next step was to true the hull. This took some patience from Sunday - Tuesday night. In this process we look to see that there aren't any hollows in the shape and check to see that the hull does not have any twist in it.



To do this the kayak is suspended with clamps above the saw horses. Then long pieces of wood are placed across the boat. Using your eyes and a level you work to get the sticks pararllel which assures there are not any twists between the saw horses. Any hollows or bumps in the hull are adjusted by loosening or tightening the copper wires. This process takes a while to get right. The keel line (bottom of hull on centerline) needs some fairing. Hollows can be taken out by loosening the keel wires and pushing wedges between the panels. This puts a little more 'V' in the hull and lowers the keel slightly.

It is starting to look like a boat!

Saturday continued.... Once the bottom was aligned with the sides we both worked from bow to stern on each side stitching the panels together.




So its a boat. A spikey boat...but definitely a boat!

Stitching


So Saturday was a busy day. About 4 or 5 hours of work. Here is the summary. First we drilled holes along both sides of the bottom panels and wired the straight keel edge. Next we stitched the ends of the sides together.


Then we opened up the side panels...




and then placed the bottom panels onto of the sides and opened them like a book along the stitched keel.





Luke then drilled holes along the edge of the side panels that aligned with the holes on the bottom panels.




Thursday, January 11, 2007

Susan prepares for the next step

After letting the sheer clamps cure for 24 hours we removed the clamps and and we pleased to discover that we did not epoxy the two sides together. Not major mess ups just yet (knock on okoume plywood!) The tape came off to reveal two beautiful sides. Below is Susan just giving the edges a light sand so they will be ready for the next step...STICHING. It will look like a boat soon. Stay tuned.
Luke admires his hard work.

Max Lends a Hand...I mean Paw


Max the kitten loves Kayaks and he really wants to help out. Too bad his idea of helping out is chewing on the plywood.


Attaching the Sheer Clamps

Next step is to attach the sheer clamps to the side panels. These are stiff 1 inch x 1 inch x 15 feet long pieces of wood that are epoxied to the top of the side panels that allow you to attach the deck to the sides and then allow you to fasten deck hardware to the deck. It is a pretty complicated step that involved tapeing off the side panels so they don't stick together or get epoxy on the outside. Then we had to measure and mark where the sheer clamps line up on the side panels. Then we mixed the epoxy and carefully placed the sheer clamps on the sides and clamped them all together with lots of C clamps and PVC Clamps...lots. That was easier to say then it was to do.

Scarfs....not the kind that keep you warm


After unpacking the 3 small boxes for Susan's kayak (the Chesapeake 16LT) Luke carefully inspects all of the pieces.

Next task is taking the 8 foot lengths of okoume plywoods and turning them into 16 foot lengths. This is done by applying epoxy thickened with silica on the scarfs, angled cuts on one end of each piece of plywood. Some say Luke has set a new bar with the quality of the scarf joints. Check it out...almost like magic and it is one long piece of very thin plywood.

Sunday, January 7, 2007

Winter Project


So our weekends and weeknights and pretty much any extra free time we have this Winter will be spent building kayaks. We have purchased kits from Chesapeak Light Craft and will be constructing a Chesapeae 16LT for Susan and a Sheerwater 17 for Luke. We know lots of you are eager to follow along with us here in the basement of 44 Cedar. Stay tuned for good times to come.